Home » FG Suspends Lagos-Ibadan Bridge Construction

FG Suspends Lagos-Ibadan Bridge Construction

by Ikeoluwa Juliana Ogungbangbe

KEY POINTS


  • The Federal Government suspended pedestrian bridge construction at Aseese on the Lagos-Ibadan Expressway after a gridlock lasted more than 20 hours.

  • Motorists and commuters were stranded overnight, with some trekking several kilometres and others paying sharply increased transport fares.

  • TRACE announced an indefinite suspension of the construction-related traffic diversion pending further directives.


The Federal Government has suspended the construction of a pedestrian bridge at the Aseese area of the Lagos-Ibadan Expressway following a prolonged traffic gridlock that left motorists stranded for more than 20 hours.

The project, being handled by the Federal Ministry of Works in collaboration with CBC Construction Company, was scheduled to run from November 18 to November 22 to facilitate the installation of the pedestrian bridge.

The construction involved a temporary diversion of inbound Lagos-bound traffic towards the Lagos carriageway at Aseese, with motorists expected to return to their normal route at a designated exit opposite Christ Embassy.

However, the diversion triggered severe congestion that began around 2pm on Wednesday and lasted until about noon on Thursday, leaving thousands of motorists and commuters stranded.

Motorists spend hours on the road

Several commuters were forced to spend hours on journeys that ordinarily take much less time, while others abandoned their vehicles and trekked long distances to reach their destinations.

Some passengers travelling from Ibadan shortly after 11am reportedly did not arrive in Magboro until around 5.30pm. Another motorist said he spent eight hours travelling from Mowe to Magboro.

The congestion also affected commercial transportation, as motorcycle operators increased their fares significantly.

One commercial motorcyclist reportedly demanded as much as N6,000 from a passenger travelling from Mowe to Ibafo, while other commuters faced increased fares on shorter routes.

Some commercial drivers also increased fares from Mowe to Berger to between N3,000 and N5,000, compared with the usual N700 to N800 charged by vehicles before the gridlock.

The traffic situation was further worsened by motorists driving against traffic in attempts to escape the congestion.

Sunday Dare criticises timing of construction

President Bola Tinubu’s Special Adviser on Media and Communications, Sunday Dare, criticised the timing of the construction work, questioning why the contractor chose to carry out the project during busy traffic hours instead of at night.

Dare, who was also caught in the traffic, said he spent more than five hours trying to travel from Lagos to Ibadan for radio and television appearances ahead of the APC presidential rally scheduled for Saturday in Ibadan.

He lamented that thousands of commuters were stranded, with many abandoning their vehicles to trek to their destinations.

Dare called for construction activities along busy highways to be scheduled during periods of lighter traffic to reduce the hardship experienced by road users.

Other motorists also shared their experiences on social media, with some reporting that they spent up to 12 hours in the gridlock.

TRACE suspends traffic diversion indefinitely

Following the prolonged congestion, the Ogun State Traffic Compliance and Enforcement Agency (TRACE) announced the indefinite suspension of the construction-related traffic diversion.

TRACE spokesperson, Babatunde Akinbiyi, said the decision followed the traffic challenges experienced along the corridor between Wednesday and Thursday morning.

The agency said the suspension would remain in place pending further directives from the relevant authorities, adding that the traffic management arrangements surrounding the construction project would be reviewed.

TRACE also apologised to motorists and commuters for the delays, discomfort and inconvenience caused by the diversion.

 

You may also like

Social Media Auto Publish Powered By : XYZScripts.com